冷再生機(jī)在道路施工前有哪些要求

來(lái)源:http://lvuee.com/ 日期:2022-02-16 發(fā)布人:
在以前道路施工的時(shí)候,是需要將舊的瀝青路面鏟除,造成了很大的浪費(fèi),而現(xiàn)在冷再生機(jī)出現(xiàn),可以減少浪費(fèi)。冷再生機(jī)是指瀝青路面就地冷再生是利用一體的再生設(shè)備、添加材料、一次拌和成型工藝,通過(guò)新鋪結(jié)構(gòu)面層,構(gòu)成舊路面改造新的一套完整體系。
In the previous road construction, it was necessary to eradicate the old asphalt pavement, resulting in a lot of waste. Now the emergence of cold regenerator can reduce waste. Cold recycling machine refers to the in-situ cold recycling of asphalt pavement. It uses the integrated recycling equipment, added materials and one-time mixing and forming process to form a new complete system for the reconstruction of old pavement through the newly paved structural surface.
準(zhǔn)備工作:冷再生租賃前的各項(xiàng)準(zhǔn)備工作在施工前到位,確保工期正常進(jìn)行。主要內(nèi)容包括:人員準(zhǔn)備、機(jī)械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。
Preparations: all preparations before cold regeneration lease shall be in place before construction to ensure the normal construction period. The main contents include: Personnel Preparation, machinery preparation, material preparation, traffic coordination and logistics support.
材料要求:水泥選用強(qiáng)度等級(jí)為32.5、初凝時(shí)間≥3h、終凝時(shí)間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥。水泥應(yīng)具有良好的工作性、低水化、高后期強(qiáng)度、耐久性、耐腐蝕性和抗裂性能。
Material requirements: Portland or ordinary portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h shall be selected. The cement shall have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
機(jī)械要求:工程施工過(guò)程通過(guò)再生機(jī)組來(lái)完成,再生機(jī)組包括:冷再生主機(jī)、水泥稀漿車、平地機(jī)、壓路機(jī)等。
Mechanical requirements: the construction process of the project is completed by regeneration unit, which includes cold regeneration host, cement slurry truck, grader, roller, etc.
人員要求:工程技術(shù)人員及機(jī)械操作人員應(yīng)經(jīng)過(guò)冷再生培訓(xùn)并經(jīng)過(guò)考核合格后方可上崗。
Personnel requirements: engineering technicians and mechanical operators shall receive cold regeneration training and pass the examination before taking the post.
工程協(xié)調(diào):作好施工總體計(jì)劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作業(yè)面的遮擋。
Project coordination: make the overall construction plan, take half width construction without interrupting traffic, do a good job in traffic dredging during construction, and prepare for the shelter of the construction surface.
本文由冷再生機(jī)租賃為您提供,我們的網(wǎng)站是:http://lvuee.com 我們將以全心全意的熱情為您提供服務(wù),歡迎您的訪問(wèn)
This article is provided for you by the cold regenerator rental. Our website is: http://lvuee.com We will provide you with services with wholehearted enthusiasm. Welcome to visit

閱讀/ Recommended reading

  一、施工步驟  1、 Construction steps  (一)施工準(zhǔn)備  (1) Construction preparation  需要冷再生施工的路面要平坦,如有大...

冷再生機(jī)租賃:現(xiàn)場(chǎng)瀝青路面冷再生機(jī)用于瀝青混凝土路面的銑刨以及添加瀝青、水等材料后的舊瀝青路面的再生。 2026-01-19
冷再生機(jī)租賃:率、多用途助力公路基層底層穩(wěn)定土現(xiàn)場(chǎng)就地拌和作業(yè) 2026-01-16
冷再生機(jī)租賃:淺析冷再生技術(shù)的使用現(xiàn)狀及存在問(wèn)題 2026-01-14
冷再生機(jī)租賃:道路冷再生時(shí)粒徑過(guò)大該怎么處理 2026-01-13

產(chǎn)品/ Recommended products